Define objective
State whether the priority is shifting, peak support, resilience or another operating need.
Quick Configurator
Use these prompts to prepare a clear first conversation about an intended system.
State whether the priority is shifting, peak support, resilience or another operating need.
Capture available electrical information, location and project stage.
Use a project brief to identify documentation and support questions.
Selection note: LFP and NMC storage choices involve thermal behavior, energy density and lifecycle economics. Usable capacity, cycle life, C-rate and state-of-charge operating window must be verified for the intended duty cycle, together with the applicable UL 9540, UL 1973 and local installation requirements.
For a project review, document battery usable capacity in kWh, cycle life at the stated depth of discharge, state of charge, C-rate, battery management system, PCS and EMS interface. LFP versus NMC is an application-specific trade-off; the final scope must also verify UL 9540 / UL 1973 applicability, thermal management and the intended dispatch duration.